San Diego USD - CC26-0470-05-00-00
Interim Housing and Permanent Modular Classrooms at Mission Bay High School
Addendum A
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| ADDENDUM NO. A | 6.2 MB | ||
| Appendix A_Boring Logs and Maps | 20.6 MB | ||
| Appendix B_Hazmat Report and Work Plan | 9.7 MB | ||
| Appendix C_SWPPP Documents | 32.2 MB | ||
| Appendix D_DSA 103_Inspection List | 123.4 KB | ||
| Appendix E_Mission Bay HS Bell Schedule_2025-26 | 174.9 KB | ||
| Appendix G_CGS Final Acceptance Letter | 321.4 KB | ||
| Appendix I_Electrical Equipment Photos_Exhibits A,B,C | 2.3 MB | ||
| Drawings.Add A | 42.9 MB |
Addendum B
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum No. B | 778.5 KB | ||
| Appendix C_SWPPP Documents.Add B | 26.8 MB | ||
| Appendix F_Keying Schedule.Add B | 351.1 KB | ||
| Appendix H_Interim Housing Phasing Plan.Add B | 1.1 MB | ||
| Drawings.Add B | 8.9 MB |
